City Line Road

  • Preliminary planning, design, environmental permitting and construction of a 3-lane roadway with continuous two-way left turn lane from W. San Antonio St. to Old Fentress Rd. Includes sidewalk and shared use path throughout project limits and realigns offset intersection of Maple St.

  • W. San Antonio St. to FM 20

  • $15,944,754