City Line Road
-
Preliminary planning, design, environmental permitting and construction of a 3-lane roadway with continuous two-way left turn lane from W. San Antonio St. to Old Fentress Rd. Includes sidewalk and shared use path throughout project limits and realigns offset intersection of Maple St.
-
W. San Antonio St. to FM 20
-
$15,944,754