Borchert Drive / Loop

  • Preliminary planning, design, environmental permitting and construction of a 3-lane roadway with continuous two-way left turn lane from SH 142 to Black Ankle Road.

    Includes sidewalks and a shared use path throughout project limits.

  • W. San Antonio St. to SH 142

  • $17,008,259