Bridle Path
-
Preliminary planning, design, environmental permitting and reconstruction of the 2-lane roadway with turn lanes at the US 183 and FM 2984 intersections. Project includes a traffic signal at the US 183 intersection.
-
US 183 to FM 2984
-
$9,314,940